The ASM SIPLACE 03159555 is a Head Care Station V2.3 assembly used as service equipment for SIPLACE placement-head maintenance and calibration work. It is not simply a machine-side communication tester. SIPLACE service documentation identifies the 03159555-xx Head Care Station as dedicated workshop equipment and, for TwinStar service procedures, requires the head module to be fitted to the station for calibration and measurement work.
For procurement, the important question is therefore not only which SIPLACE machine is installed on the production floor. The station version, P/N suffix, placement-head family being serviced and the equipment supplied with the station should be checked together. A station identified as 03159555 may still need its actual configuration reviewed before it is selected for a specific head-service task.
This matters especially when a factory is building its own placement-head maintenance capability or replacing an existing Head Care Station. Buying only from a general HCS description can leave the maintenance team with the wrong version or an incomplete service setup. Before quotation, it is better to provide the 03159555 nameplate, current station photos and the head type that needs to be serviced.
For related placement-head modules, components and repair support, see our ASM SIPLACE SMT head and placement-head parts.
SIPLACE 03159555 Head Care Station Specifications
| Part Number | 03159555; confirm the complete suffix from the station label |
| Product | SIPLACE Head Care Station |
| Version | V2.3 |
| Assembly Level | Head Care Station assembly |
| Service Role | Placement-head maintenance, measurement and calibration support |
| Documented Service Example | Twin module force-measuring-unit calibration and 1 N measurement |
| Purchase Check | P/N suffix, station version, target head family and included service hardware |
The 03159555 is best treated as placement-head service infrastructure rather than as an ordinary replacement part. If an existing HCS is incomplete or the exact station configuration is unclear, send us the station label, photos of the installed equipment and the placement-head model being maintained. Our technical team can help narrow the required purchasing scope before a replacement station or related HCS component is selected.
For purchasing approval, we can also prepare a Formal Specification Confirmation Sheet after the P/N, version and required service configuration have been checked. This gives engineering and purchasing teams a clearer basis for confirming what is included before the order is released.